We started by building a solid landing that could support the bottom step of the landscape ties. Each run of the 8x8 landscape ties is scribed to fit the sandstone rock that lies just under the soil. The rock added complexity by forcing us to work around it, but also let us pin the landscape ties to something very solid.
![]() |
| Using a hammer drill we chipped a pocket into the sandstone that would accept the 8x8. A hole was then drilled through the wood and into the rock and a piece of 1/2" rebar was driven in to pin the wood to the rock. |



No comments:
Post a Comment